Macintyre Wind Farm
Timeframe | 2023-2025 |
Location | 50km SW of Warwick |
Client | Acciona Energy Australia Global Pty Ltd |
Capabilities Engaged | Surveying, |
Mapping, | |
Environmental, | |
Planning |
Timeframe | 2023-2025 |
Location | 50km SW of Warwick |
Client | Acciona Energy Australia Global Pty Ltd |
Capabilities Engaged | Surveying, |
Mapping, | |
Environmental, | |
Planning |
SHG provided Cadastral Surveys and tenure advice to create longline easements for construction of 65 kms of new 330kv transmission lines and excised land for 2 switching stations connecting the Macintyre Wind Farm to the Queensland transmission grid over 30 rural properties and installed primary survey control over the length of the route
Acciona engaged SHG to audit all 180 wind turbines and environmental clearing areas to ensure compliance with Acciona's tight construction tolerances and State Government conditions. Precise survey measurements were taken on foundation hold down bolts and tower flanges to check ovality prior to installing turbines onto foundations.